The site is 38 acres in size and includes six full size pitches along with two half sized ones and a practice area. It has a synthetic indoor pitch to allow for the all too common inclement Scottish weather.
It's divided into three sections: Administration, Professional and Youth. Both sets of footballers have their own reception area, dining room, changing room, lecture room and kit stores.
Two full-sized and one half-sized pitch are dedicated just to the first team - the rest used by the youth set ups. The Professional Pitch has undersoil heating.
All the players use the gym, medical suite and indoor synthetic pitch. The gym cost £150,000 and all machines and the players that use them can be linked to a central computer for analysis. The editing suite cost £50,000 - all very hi-tech! They also have a hydrotherapy pool.
In 2019, a brand new 250 capacity stand opened at the Training Centre - funded by the Rangers Fans Fighting Fund (RFFF), as well as a contribution from the Scottish Football Partnership.
Seven security guards are employed and the site costs ~£1.5million per year to run.